This is a cache of https://service.jena.de/en/demolition-structures. It is a snapshot of the page at 2024-12-22T19:03:20.297+0000.
demolition of structures | Jena Service Dummy link to fix Firefox-Bug: First child with tabindex is ignored

demolition of structures

Der Abbruch von Gebäuden und anderer baulicher Anlagen ist, soweit nicht verfahrensfrei gestellt, dem Fachdienst Bauordnung und Denkmalschutz mindestens einen Monat vor der beabsichtigten Beseitigung förmlich anzuzeigen.

Pursuant to Section 60 (3) of the Thuringian Building Code (ThürBO), the demolition of buildings in building class GK 1 and free-standing buildings in GK 3, as well as structural installations whose construction is also exempted pursuant to Section 60 (1) of the ThürBO, must not be notified.

In the case of buildings that are not free-standing, the stability of the adjacent buildings must be assessed by a qualified structural engineer within the meaning of Section 65 (2) ThürBO (specialist planner for stability) and confirmed by signature on the notification form. Any proof required is only for civil law assessment in the event of damage and is not to be submitted to the building supervisory authority.

With the demolition notification, the building supervisory authority is merely informed of the pending removal of a building structure. In accordance with § 60 Para. 3 ThürBO, no processing of the demolition notification takes place in the Building Regulations Department, but only a completeness check.

Technical problems are therefore to be discussed with the commissioned structural engineer and, if applicable, with the

Thuringian State Office for Consumer Protection
Department of Occupational Safety - Regional Inspectorate East Thuringia
Otto-Dix-Strasse 9
07501 Gera (PF 1154, 07501 Gera)

Tel. 0049 365 8211-0
Fax 0049 365 8211104
as-ost@tlv.thueringen.de

to be clarified.

The building owner is responsible for any further coordination, notification, etc. that may be required with other authorities, in particular the lower waste management authority and the lower monument protection authority.

Irrespective of the obligation to notify or exemption, a demolition survey form (statistics) must be submitted for all buildings to be demolished.

The "only" partial demolition is subject to the regular building permit procedure and is considered a conversion (-> see building permit ).

The demolition notification for structural installations in accordance with § 60 Para. 3 ThürBO must be submitted in 1 copy:

  • Notification form with signature of building owner and specialist planner for structural stability
  • Statistical demolition survey form
  • Extract from the real estate map
  • Site plan with marking of the demolition object (usually yellow overdrawing) with signature
  • Specification of building class and brief explanation (if necessary)
  • Views (as-built documents) or photos (if required)
Tag Zeiten
Montag 08:00 – 12:00 und 13:00 – 16:00 Uhr
Dienstag 08:00 – 12:00 und 13:00 – 16:00 Uhr
Mittwoch keine Sprechzeiten
Donnerstag 08:00 – 12:00 und 13:00 – 18:00 Uhr
Freitag 08:00 – 12:00 Uhr

Hinweise

Um vorherige Terminvereinbarung wird gebeten.

Services Fee
Receipt of the demolition notice free of charge
  • Thuringian Building Code (ThürBO), § 60 Para. 3
Team Project Review District I and Team Project Review District II

Am Anger 26
07743 Jena
Germany