Drinking water - consulting & monitoring
Das Gesundheitsamt berät Sie kostenlos zu Auffälligkeiten im Trinkwasser (Geruch, Geschmack, Farbe), sowie bei Fragen zur Überwachung der Trinkwasserinstallation.
Procedure/Deadlines
Obligation to notify according to § 13 TrinkwV paragraph 1 - 3
- for the construction of a water supply system at least four weeks in advance
- for the initial commissioning or recommissioning of a water supply system at least four weeks in advance and for the decommissioning of a water supply system or parts thereof within three days
- in the case of structural and operational changes to drinking water-carrying parts of a water supply system which may have a significant effect on the quality of the drinking water, no later than four weeks in advance
- in the event of transfer of ownership or the right of use of a water supply system to another person, at least four weeks in advance
- as early as possible in the case of the construction or commissioning of a water supply system and the expected duration of its operation.
Obligation to notify according to § 13 Trinkw paragraph 4
- Installations intended for the abstraction or delivery of water which is not of drinking water quality and which are installed in the household in addition to the water supply installations in accordance with section 3 number 2 (wells, rainwater installations).
Opening hours
Tag |
Zeiten |
---|---|
Montag | 08:00 – 11:30 Uhr |
Dienstag | 08:00 – 11:30 Uhr |
Mittwoch | keine Sprechzeiten |
Donnerstag | 08:00 – 11:30 Uhr und 14:00 – 18:00 Uhr |
Freitag | 08:00 – 11:30 Uhr |
Bitte vereinbaren Sie telefonisch einen persönlichen Beratungstermin.
Fees
services | Fee |
---|---|
Testing of a water supply system |
according to expenditure |
Taking a water sample |
10,00 € |
Determination of the temperature |
3,00 € |
Determination of the pH value |
10,00 € |
Determination of free chlorine |
5,00 € |
Determination of combined chlorine |
5,00 € |
Determination of conductivity |
3,00 € |
Determination of odour |
3,00 € |
Determination of clarity |
3,00 € |
Determination of the colouring |
3,00 € |
Official release certificate for a drinking water pipeline after construction work on the drinking water network |
25,00 € |
Legal basis
- Infection Protection Act
- Drinking Water Ordinance (TrinkwV)
- Ordinance on the general conditions for the supply of water
- UBA recommendations
- DVGW - Worksheets
- DIN
- VDI Guideline 6023