VE-Wj 05A Bei den Fuchslöchern / 1st construction phase (Wenigenjena)
Procedure
- Resolution on the preparation of the site: 23.06.1993
- Resolution on statutes: 15.02.1995
- Legal force through public announcement: 21.03.1995
Plan content
The designation of the planning area was made with the aim of meeting the urgent demand for housing at that time. On the approx. 12.2 ha large area, areas were designated for the construction of single, double, terraced and multi-family houses.
One of the urban planning objectives was to achieve a staggering of the building structures by specifying building heights, thus taking into account the special features of the topography. In addition, a commercial and service centre was designated in order to lend a special attractiveness to the newly developing residential area.
Necessary compensatory measures were implemented both in the plan area and within an additionally designated 2nd area of application.
Realisation status
The site is fully developed (as of September 2007).
Important note
The plan components available as downloads are for information purposes only. Only the legally binding plan documents that can be viewed in the Urban Planning Department are authoritative and binding. Due to the volume of data and the size of the plan, only an overview plan can be viewed under downloads. The detailed sub-plans are available in paper form from the Urban Planning Department.