This is a cache of https://planen-bauen.jena.de/en/b-j-29-felsenkeller-rathenaustrasse-jena-south. It is a snapshot of the page at 2024-11-23T18:11:08.791+0000.
B-J 29 Felsenkeller / Rathenaustraße (Jena South) | Jena Planen und Bauen Dummy link to fix Firefox-Bug: First child with tabindex is ignored

B-J 29 Felsenkeller / Rathenaustraße (Jena South)

  • Decision to initiate: 10.05.2000
  • Statutory resolution: 27.08.2003
  • Legal force through public announcement: 01.03.2004

The development plan was drawn up with the aim of reorganising the urban development of the site of the former municipal brewery and the former barracks at Westbahnhof. The high-quality project area close to the city centre is to be developed on an area of 3.8 ha into a technology location for the settlement of business and science (Part B of the development plan).

The remaining area of 3.1 ha (Part A of the development plan) is intended for the construction of a justice centre. Accordingly, part of the area is designated as a commercial area (GE 1-5) and the other as a special area for the justice centre (SO 1-3).

The planning area is completely developed. The Justice Centre has been completed and was inaugurated at the beginning of 2004. The remaining building area is 100% marketed (June 2014).

The documents attached as downloads are for information purposes only. Only the legally binding copy of the plan, which can be viewed at the Urban Planning Department, is authoritative.